Toowoomba Second Range Crossing: The Nexus Delivery Wrap-Up

ComplyFlow was engaged to manage compliance, contractor safety and plant management on the Toowoomba Second Range Crossing, now the Toowoomba Bypass, for the Nexus Delivery joint venture of Ferrovial Agroman Australia and Acciona Infrastructure. Construction started in April 2016 and the 41 km bypass opened to traffic in September 2019, delivered through a public-private partnership with Nexus Infrastructure at an indicative total cost of AU$1.606 billion.

  • Published
  • Updated
  • 2 min read
An aerial view of a curving concrete viaduct carrying a dual carriageway on tall piers across a forested valley, with a single car travelling on the near carriageway
A four-lane crossing of the Toowoomba Range, built by a workforce whose tickets, inductions and plant records all had to hold for three and a half years.

This is a project note from 2020, marking the end of one of the larger civil jobs ComplyFlow has worked on.

What We Did on the Project.

ComplyFlow was engaged to manage compliance, contractor safety and plant management for Nexus Delivery, the joint venture of Ferrovial Agroman Australia and Acciona Infrastructure that designed and built the crossing. It was a project on which we refined a good deal of how the platform handles contractor records and plant at scale, and the credit for that sits with the team on site as much as with ours.

What the Project Was.

The Toowoomba Second Range Crossing, now called the Toowoomba Bypass, is a 41 km route from the Warrego Highway at Helidon Spa in the east to the Gore Highway at Athol in the west, via Charlton. Queensland’s Department of Transport and Main Roads records that construction started in April 2016 and the bypass opened to traffic in September 2019.1

It was delivered through a public-private partnership arrangement with Nexus Infrastructure Pty Ltd. Transport and Main Roads gives the indicative total investment as AU$1.606 billion, made up of AU$1.137 billion from the Australian Government and AU$469 million from the Queensland Government.1

The point of the road was freight. Transport and Main Roads recorded 24,600 vehicle movements a day on the original range crossing, of which 4,400 were heavy vehicles, and expected up to 80% of those heavy vehicles to divert onto the bypass.1

What a Project This Size Asks of a Compliance System.

Three and a half years of construction is the part that matters from where we sit. A licence, a ticket, an induction, or a plant inspection record does not stay current for three and a half years on its own, and a project of this size turns over a lot of people and a lot of machinery in that time.

That is the work: keeping every record current while the site is running, rather than assembling it afterwards for an audit. Our infrastructure page covers the contractor side of it, and our plant and equipment page covers the machinery side.

Build for the Turnover, Not for the Headcount.

If you are standing up a compliance system for a major project rather than for a business as usual site, the difference is the turnover, not the headcount. Book a demo and bring the contractor list.

Sources

  1. Toowoomba Bypass project page Queensland Department of Transport and Main Roads, read via the Internet Archive because the live page refuses automated requests, Archive capture of 21 September 2020
Rory McNeil

Written by

Rory McNeilHead of Marketing, ComplyFlow

Rory leads marketing at ComplyFlow. He writes about how safety and compliance teams find, judge, and buy software, and about the evidence behind the claims vendors make.

Writes about: Buying compliance software, Evidence and claims, ComplyFlow news

Questions

Questions People Ask About This.

What was the Toowoomba Second Range Crossing?

A 41 km grade-separated bypass of Toowoomba in Queensland, running from the Warrego Highway at Helidon Spa in the east to the Gore Highway at Athol in the west, via Charlton. It is now called the Toowoomba Bypass. Transport and Main Roads records that construction started in April 2016 and it opened to traffic in September 2019.

What did ComplyFlow do on the project?

ComplyFlow was engaged to manage compliance, contractor safety and plant management for Nexus Delivery, the joint venture of Ferrovial Agroman Australia and Acciona Infrastructure that designed and built the crossing. It was one of the large civil projects on which we refined how the platform handles contractor and plant records at scale.

What did the Toowoomba Bypass cost, and who paid for it?

Transport and Main Roads gives an indicative total investment of AU$1.606 billion, made up of AU$1.137 billion from the Australian Government and AU$469 million from the Queensland Government. It was delivered through a public-private partnership arrangement with Nexus Infrastructure Pty Ltd, and the road is tolled.

See it against your own contractors, sites, and rules.

Book a 30-minute demo. We will show ComplyFlow working with your kind of sites, your kind of contractors, and your requirements. No slides, no hard sell.

  • ISO 27001
  • Hosted on AWS
  • Microsoft & Okta SSO
  • API & MCP
  • Data in Australia

Compliance you can prove, instantly.