| Prequalify a contractor | EPC and O&M panel members register once; electrical licences, GWO Basic Safety Training, and insurances uploaded online. | GWO and licence renewal reminders go out on their own, weeks before the 24-month expiry. | Certificates and safety documents read against your requirements; gaps shown. |
| Induct a Worker for a site | Site-specific induction for turbine, solar array, or BESS work, completed on the Worker’s phone before travel. | An expired GWO ticket or HRW licence blocks sign-in until it is renewed. | Licences and tickets checked as they are uploaded, before the Worker reaches a remote site. |
| Check in at a remote or unmanned site | QR check-in on the Worker’s own phone at the compound or the turbine base, no gatehouse required. | The record checks GWO currency, High Risk Work (HRW) licence, and induction at check-in: not cleared, not on site. | Ask your AI assistant who checked in at which site today, via MCP. |
| Isolate and switch before work starts | High-voltage isolation and switching permits on a phone, sequenced across multiple turbines or inverters. | Routed to the authorised person and closed with a time-stamped record of who isolated what, and when. | The SWMS behind the isolation read against your standard before the permit is approved. |
| Enter a confined space | A confined space entry permit for the nacelle or the inverter station, with atmospheric testing and a standby person recorded. | The permit will not close without the standby sign-off and the exit check. | AI flags a permit missing a standby person before it is submitted. |
| Lift with a crane | Dogging and rigging licences and the lift plan for a blade or nacelle lift held against the job. | A Worker without a current dogging or rigging licence cannot be rostered to the lift. | Licence currency is checked automatically against the lift plan’s crew list. |
| Hand over from EPC to O&M | The contractor’s compliance record, permits, and inductions travel with the asset from construction into operations. | The O&M provider inherits the record instead of starting a new one at handover. | AI flags any licence or induction due to lapse in the first months of the O&M contract. |
| Report to the developer, owner, or fund | One searchable record per project, not a folder per EPC contractor or per O&M provider. | Live compliance completion rates and scheduled reports into Power BI. | Ask in plain English through ChatGPT, Claude, or Copilot; the answer comes from the record. |